Average EV/EBITDA Ratio
The today ev/ebitda ratio is 9.41x as of Sunday, June 28, 2026, shown against its trailing averages.
AG Average EV/EBITDA Ratio
AG EV/EBITDA Ratio Averages
EV/EBITDA RATIO TODAY
9.41x
EV/EBITDA RATIO TTM
18.01x
EV/EBITDA RATIO 3Y
20.94x
EV/EBITDA RATIO 5Y
18.68x
EV/EBITDA RATIO 10Y
19.44x
EV/EBITDA RATIO 15Y
17.37x
EV/EBITDA RATIO 20Y
20.02x
About First Majestic Silver Corp.
First Majestic Silver Corp. is a North American mining company dedicated to the exploration, acquisition, development, and operation of mineral properties, primarily concentrating on silver and gold output. The company fully owns and operates a portfolio of significant mining assets. In Mexico, these include the San Dimas Silver/Gold Mine (71,868 hectares in Durango and Sinaloa), the Santa Elena Silver/Gold Mine (102,244 hectares in Sonora), the La Encantada Silver Mine (4,076 hectares in Coahuila, complemented by 1,343 hectares of surface rights), the La Parrilla Silver Mine (69,478 hectares in Durango), the Del Toro Silver Mine (comprising 3,815 hectares of mining concessions and 219 hectares of surface rights in Zacatecas), the San Martin Silver Mine (12,795 hectares across 33 mining concessions in Jalisco), and the La Guitarra Silver Mine (39,714 hectares). Beyond Mexico, its holdings extend to the Jerritt Canyon gold mine, spanning approximately 30,821 hectares in Elko County, Nevada. Additionally, First Majestic maintains an interest in the Springpole project, a gold and silver prospect encompassing around 41,913 hectares in Ontario, Canada. Established in 1979, the firm initially operated as First Majestic Resource Corp. before adopting its current name, First Majestic Silver Corp., in November 2006. Its corporate headquarters are located in Vancouver, Canada.
- Sector
- Basic Materials
- Industry
- Silver
- CEO
- Keith N. Neumeyer